What is the purpose of this big project?
The purpose is to improve safety and update the City’s infrastructure system. This street corridor improvements will incorporate green infrastructure as recommended in the City’s Management Plan (July 2018).
Will construction continue through the winter?
It is anticipated that the Contractor will work over the winter months, in an effort to complete the project sooner than anticipated.
Will the construction noise wake me up?
Per the City Ordinance, construction working hours are from 7:00 AM to 6:00 PM on weekdays, and 9:00 AM to 6:00 PM on weekends. No work will occur on Holidays.
Will any roads be closed during construction?
It is anticipated that there will be daily lane closures, with flagger activity. Please drive carefully through the construction work zone and follow the applicable temporary construction signage.
Is the Contractor willing to perform private work on my property?
The Contractor is not available nor willing to complete private work outside of the right-of-way.
Will my water service ever be disrupted?
It is possible your water service may have temporary shut downs. Residents will be notified in advance if this is necessary.
How will the grass parkways be restored?
Landscaped areas disturbed during construction will be restored with topsoil, fertilizer, salt tolerant sod.
Will I ever be restricted access to my driveway or entrance?
The Contractor will be required to provide temporary access to all private driveways or public/residental entrances. If it is determined through construction that a closure is required, additional information will be provided on an as-needed basis.
How can I stay up to date with the progress of the project?
You can visit the project website and sign up for project updates via email at 16thstreetproject.com